A sample of food was heated with Benedict’s solution which changed colour to green.
A second sample of the same food was boiled with dilute hydrochloric acid and neutralised using sodium hydrogencarbonate. It was then heated with Benedict’s solution which changed colour to red.
What did these results show?
1 )
A
2 )
B
C
4 )
D
تحلیل ویدئویی تست
منتظریم اولین نفر تحلیلش کنه!