The following information is available about two products.
Production is planned to be 100 units of each product.
700 kilos of material X and 400 kilos of material Y are available. A total of 800 direct labour hours can be worked.
What are the limiting factors?

direct labour only
2 )
material X only
3 )
material Y only
4 )
all three inputs